Bnc 7000 Series User Manual Manual do Utilizador Página 41

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 54
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 40
41
3.7.1 Measurement Procedure
Before starting the calibration and measurement procedure, some parameters must be configured.
Firstly, select single or two-channel measurement.
Next, select what kind of external phase shifter is deployed. Any phase shifter is suitable that does not
excessively contribute own noise such as digital or mechanically tuned models. Models that are tuned
via analog voltage can be supported by the SERIES 7000 GUI.
The measurement procedure to perform an additive measurement consists of three steps:
Berkeley Nucleonics Corporation 2955 Kerner Blvd., San Rafael, CA 94901
Phone: 415-453-9955, Fax: 415-453-9956, Email: [email protected], Web: www.berkeleynucleonics.com
Vista de página 40
1 2 ... 36 37 38 39 40 41 42 43 44 45 46 ... 53 54

Comentários a estes Manuais

Sem comentários